Job Description

  1. Replacing the gutters at the front of the house with new plastic square shape gutters
  2. Replacing the downpipe located at the front left side of the house with new plastic square shape pipe;
  3. Installing new eaves felt at the front of the house (the roofing felt that overlaps into the guttering);
  4. Filling all cracks and holes on the fascia board, with waterproof wood filler.